The Go On
Cutting Heating Corporation
· Floor height does not increase after completion of construction
· The heating is going up fast
· cement finish creates a solid floor
· It is a suitable installation method for heavy furniture or places where many people enter
Order of construction
1. Show where to cut
1. Show where to cut
2. Use a cutter to dig a hole on the floor
2. Use a cutter to dig a hole on the floor
3. Insert carbon fiber heating element
3. Insert carbon fiber heating element
4. fill the groove with mortar cement
4. fill the groove with mortar cement
5. Remove residual cement
5. Remove residual cement
6. thermostat installation
6. thermostat installation
7. Fever test
7. Fever test